
CA License #1158464 • Long Beach, CA
ADU electrical wiring and planning
An ADU is a second dwelling on a property that was wired for one. The interesting questions are about capacity, metering, and how power gets from the main service to the new structure — and they are much easier to answer before the trench is dug.
When this service is the right fit
- You are converting a garage or building a detached ADU in the backyard.
- You are not sure whether the existing service can carry a second unit.
- The ADU needs its own subpanel and a clean feeder route.
- You want the electrical scope planned alongside the rest of the build, not bolted on later.
What Bravo can help with
Capacity and feeder planning
Reviewing the existing service, determining what the second unit needs, and planning the feeder route from the main service to the ADU.
Subpanels and distribution
A properly sized subpanel at the ADU with distribution planned around how the unit will actually be lived in.
Complete unit rough-in and trim
Circuits, lighting, kitchen and bath power, ventilation, and finish work for a full living space in a compact footprint.
Garage conversions
Converted garages carry their own surprises. Existing circuits often need to be reworked rather than reused as-is.
How this job runs
Four steps from first call to final walk-through
- 01
Listen
The ADU plan, whether it is new build or conversion, and your timeline.
- 02
Inspect
Existing service, panel location, and the physical route to the ADU site.
- 03
Plan
Feeder, subpanel, and unit scope, plus what the permitting path is likely to involve.
- 04
Build
Trenching coordination, feeder, rough-in, trim, testing, and walk-through.
Questions
Answered plainly
Anything that depends on the property gets answered properly during the site visit, not guessed at here.
- Does an ADU need its own panel?
- In most cases a subpanel serves the unit, fed from the main service. The right configuration depends on the property, the service size, and how the unit will be used.
- Will the main service need to be upgraded?
- Sometimes yes, sometimes no. It comes down to existing capacity versus the added load, which requires a look at the property.
- Can you work with my ADU builder?
- Yes. Coordinating with the builder or GC on trenching, framing, and inspection milestones is standard on these projects.
- Is a garage conversion cheaper than new construction?
- Electrically it can be, since the structure and some routing already exist — but only after the existing wiring is assessed. Bravo will tell you what is reusable and what is not.
Free estimate
Start with adu wiring
Send the details and Bravo will follow up with the next step. Calling is faster if the situation is urgent.



